Installation & Commissioning

System Integration Timeline

distribution-7

Equipment Delivery

Our efficient logistics companies deliver in a timely fashion & excellent condition. Consulting with client, all the equipment is stored in a safe place.

Steven Bohn, an engineer at SunEdison oversees SunEdison's testing facility at SolarTAC in Aurora, CO. SunEdison is an Original Founding Member of SolarTAC. SolarTAC is an integrated, world-class test facility where the solar industry will test, validate, and demonstrate near-market solar technologies.The Solar Technology Acceleration Center is an integrated, world-class test facility where the solar industry will test, validate, and demonstrate near-market and advanced solar technologies.  The SolarTAC mission is to increase the efficiency of solar energy products and rapidly deploy them to the commercial market.

System Integration

Site supervisors guide and explain the system to the installers. Design and timeline charts are followed religiously for quick and neat installation.

control-systems-commissioning

Commissioning

System is made live after thorough checks including safety, performance & sturdiness. Report & statistics are generated and submitted to the client.

CommunitySolar_v3e

Net Metering

A Net meter is installed replacing the existing meter of the client so that surplus energy can be exported to the grid and imported back whenever required.

Our Meticulous Installation

Installation & Commissioning

Our work discipline sets up apart

Material Procurement & Delivery

As soon as an order is passed, a plan is made to procure equipment according to the timeline of the project.

Structure Installation & Module Mounting

Rooftop is cleared of debris and mounting structure is first installed. Following completion, modules are mounted on the structure.

Inverter & B.O.S. Integration

After rooftop work is done, Inverter is installed in a dry, well ventilated area with easy access for O&M. Simultaneouly the rest of the system is installed.

Testing & Commissioning

After all the equipment have been installed, a thorough check is done to ensure proper fittings and inter-module connection. The system is then made live and checked for all parameters.

Our site engineers always make sure the checklist is followed.

Fittings & interconnections are tight.

All the equipment has been installed according to its respective manual

All the alignment and level are proper.

Cable routing is carried out neatly.

Our Engineers commit rigorous testing after the system is made live.

All the electrical parameter are checked.

System is checked for structural integrity.

Performance of the system is measured.

All safety features are tested.

Before the system is installed, all the necessary permissions are sought.

System is santioned by discom before installation.

After installation, Work Completion Report is issued by DISCOM.

Bi-directional meters are purchased and tested.

Bi-directional meters are installed at the premises replacing the existing meters.

Words we live by

"The will to win, the desire to succeed, the urge to reach your full potential... these are the keys that will unlock the door to personal excellence."

Dante Remus

"The will to win, the desire to succeed, the urge to reach your full potential... these are the keys that will unlock the door to personal excellence."

John