18914
post-template-default,single,single-post,postid-18914,single-format-standard,elision-core-1.0.10,everest-forms-no-js,ajax_fade,page_not_loaded,qode-child-theme-ver-1.0.0,qode-theme-ver-4.4,wpb-js-composer js-comp-ver-6.3.0,vc_responsive
Title Image

Blog

California’s Desert Community Energy signs PPA for 50-MW solar, 200-MWh storage project

  |   Solar, solar industry

Palm Springs, California, utility Desert Community Energy has agreed to a 20-year PPA with Vesper Energy for the 50-MW solar, 200-MWh storage Deer Creek project. DCE is purchasing all of the energy from the project. This is the first solar + storage contract entered into by DCE. The Deer Creek Solar + Storage project is scheduled…

The post California’s Desert Community Energy signs PPA for 50-MW solar, 200-MWh storage project appeared first on Solar Power World.